Self performed the construction of the Canyon Ridge Bridge. Construction was required to meet TXDOT standards including a C411 concrete handrail system with integral colored concrete and lighting system.
Self performed the construction of the Canyon Ridge Bridge. Construction was required to meet TXDOT standards including a C411 concrete handrail system with integral colored concrete and lighting system.


Copyright 2021 Hasen Design Build. All Rights Reserved. Made in Fort Worth